Langland Bay – Site Progress

Hyde + Hyde Architects have been involved with a contemporary refurbishment in Langland Bay located on the Gower Peninsula, South Wales. The following post tracks the construction progress on an exposed site by the ocean, from early winter 2009 to spring 2010.

Photography by Hyde + Hyde.

view from external balcony
view south from external balcony

Unrelenting wind and winter ocean swell has created a rugged landscape that is defined by castles, medieval churches, iron age fortifications and sandy beaches.

existing winter view prior to demolition

existing winter view prior to demolition

Winter shot looking from the rear balcony towards a stormy sea prior to the demolition and refurbishment.

existing view prior to refurbishment

existing view prior to refurbishment

View looking up towards the existing house prior to partial demolition and refurbishment. The existing building presents itself as a singular object. Our ambition was to create an external envelope that created moments of shelter, protection and seclusion for our clients.

existing internal view

existing

View of the existing abandoned interior prior to demolition.

 

exposed first floor plinth

exposed first floor plinth

As soon as the walls and roof were demolished the first floor fulfilled its ambition and transformed into a simple plinth. The next construction stage involved preparing this new plateau to accommodate a significant horizontal cantilever, giving a directional orientation to the ocean and distant horizon.

scafolding concealing the refurbishment

scaffolding concealing the scope of refurbishment

corner connection detail

corner steel connection detail

steel frame assembled

steel frame assembled

The main cantilever roof of the first floor terminates after a series of spatial transitions from enclosed living space on the far right of the image, to a semi open rain canopy.

The sky frame occupies the dual role of elongating the front elevation, creating a heightened sense of drama and directional orientation, while symbolising the poetic connection between building and sky.

working with the zinc installer to achieve a perfectly thin profile drip detail

flat roof metal profile detail

We believe the overall success of the buildings atmosphere is achieved through the careful interplay of detail components, presented here as an honest expression in steel.  Working in close collaboration with the local roof installer to achieve the desired aesthetic solution.

roof - stud framing

roof - stud framing

standing seam zinc installed - ocean view

standing seam installation

idle rocks cantilever

cantilever - sky frame

A transitional space that creates shelter terminating in a sky frame – a space to relax, open to the elements yet clearly defined within the envelope of the building.

idle rocks complete

idle rocks

The exposed steel frame is celebrated simultaneously as an efficient structural solution that also plays a fundamental role in expressing the poetic idea of connecting building to place.

In May 2010 the project was short-listed for the Royal Institute of British Architects Design Awards. If you would like to find out more information

please visit the project page.

 

formation please
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.